Skip to content

Abu Dhabi · Commercial / Government · 2026

ADNEC Tower — 2nd Floor

In 2026 at Abu Dhabi, BeavCon delivered full fit-out: demolition, partitions, specialty ceilings, electrical & hvac, firefighting, automated glass, furniture & carpet for a developer client. Constraint: Occupied tower; consultant and authority approvals on the critical path. Outcome: Full floor handed over with close-out documentation.

Reviewed by Technical Manager · Registered with the Society of Engineers UAE and Abu Dhabi Municipality · Updated 10 September 2026

Constraint
Occupied tower; consultant and authority approvals on the critical path.
Solution
Single-point coordination of all trades plus consultant and authority submissions.
Outcome
Full floor handed over with close-out documentation.
Status
Completed

A complete floor fit-out inside the operating ADNEC Tower: demolition, partitions, specialty ceilings, electrical and HVAC, firefighting, automated glass systems, furniture and carpet. BeavCon held the single point of coordination for every trade and managed consultant and authority submissions, closing out with as-builts and handover records.

Services · Commercial Fit-Out · MEP Works · HVAC / AC · Aluminium & Glass · Strip-Out / Demolition

Guides · Documented close-out · Engineering-led project management · Villa renovation, one contract · Single contractor vs trades

ADNEC Tower 2nd floor reception after fit-out
ADNEC Tower — 2nd FloorCompleted
Site photographs
  • Specialty ceiling, wood wall and carpet after handover
    Specialty ceiling, wood wall and carpet after handover
  • Circular column, wood door and glazed partition
    Circular column, wood door and glazed partition
  • Glazed office with desk after furniture install
    Glazed office with desk after furniture install
  • Meeting room looking through a glass partition
    Meeting room looking through a glass partition
BuildScope by BeavCon

Request similar work

Send us your scope.

Upload drawings, BOQ or photos. A reference is issued immediately and an engineer reviews the package before it is priced.

How to use

Five steps. Pick a work type, then Next. Attach drawings if you have them. Submit on the last step.

  1. 01 Work type
  2. 02 Location
  3. 03 Details
  4. 04 Files
  5. 05 Your details
01 / 05 What kind of work is it?

Work type — what kind of package is this? Select one or more so it reaches the right estimator.

02 / 05 Where is the site?

Location — Dubai or Abu Dhabi. We mobilise to the other Emirates project by project.

03 / 05 Project details

Details — area, dates and budget. Approximate figures are fine — we confirm quantities on site.

04 / 05 Upload files

Files — drawings, BOQ or photos, optional.

    Executable files are rejected. Files are used only to prepare your quotation.

    05 / 05 How do we reach you?

    Your details — review and send. A reference is issued immediately; an estimator follows up.

    Preferred contact

    By submitting you agree to our privacy policy. Files and details are used only to prepare your quotation and are stored securely.

    01 / 05 · Work type — what kind of package is this?

    Request site visit

    Book a site visit

    An engineer visits, records constraints and photos, and a written scope follows. Dubai and Abu Dhabi first; other Emirates by arrangement.

    Reference issued on submit

    Invite BeavCon to tender

    Tender invitation

    Attach the tender documents or BOQ; an engineer confirms receipt and the submission date.

    .pdf .dwg .dxf .xlsx .xls .csv .doc .docx .jpg .png .zip · max 25 MB each · executable files rejected

    Reference issued on submit